XINWEI SHEN
- Total activity 3
- Last activity
- Member since
- Following 0 users
- Followed by 0 users
- Votes 0
- Subscriptions 1
Activity overview
Latest activity by XINWEI SHEN-
XINWEI SHEN commented,
Some additional information: 1. This is a MISOCP model; 2. The optimization status code is 12, which means that "Optimization was terminated due to unrecoverable numerical difficulties." So what ca...
-
XINWEI SHEN created a post,
Model is "Either infeasible or unbonded" reported by Gurobi, however feasible and bounded after providing with partial initial guess
AnsweredI'm calling Gurobi by Matlab to solve a power distribution system planning problem. And in one case, the model is "Either infeasible or unbonded" reported by Gurobi, however become feasible and bou...