Skip to main content

A lazy constraint and MIP optimality issue

Ongoing

Comments

2 comments

  • Official comment
    Simranjit Kaur
    • Gurobi Staff
    This post is more than two years old. Some information may not be up to date. For current information, please check the Gurobi Documentation or Knowledge Base. If you need more help, please create a new post in the community forum, or try Gurobot, our chatbot interface offering instant, expert-level support.
  • Marouane FELLOUSSI
    • Gurobi-versary
    • First Comment
    • First Question

    Update #1

    Disabling solver cuts solves the issue at the expense of runtime (and using all threads as opposed to only 1 before)

    After ~100s, the LB is correctly updated to 270.357.

     
        Nodes    |    Current Node    |     Objective Bounds      |     Work
     Expl Unexpl |  Obj  Depth IntInf | Incumbent    BestBd   Gap | It/Node Time
    
    [...]
    
     555629   155  270.32800   63    1  270.35700  270.32800  0.01%  10.3  110s
    
    Optimal solution found (tolerance 1.00e-04)
    Best objective 2.703570000000e+02, best bound 2.703570000000e+02, gap 0.0000%
    



    Update #2

    It has to do with the number of threads. Running (n > 1)-threaded, with or without solver cuts yields a correct solution.

    Update #3

    It was a numerical precision issue in the callback, that only becomes apparent on single-threaded runs. Always use tolerance when checking for feasibility, regardless of the number of threads.

    0