addGenConstrPWL: boundaries
AnsweredHello,
I have a question concerning the PWL constraint. What does Gurobi do, if one of the variables (x and y in the constraint) would need to take a higher value than the defined intervals in the PWL constraints in order to comply with another constraint?
I'm looking at x = temperature and y = "coefiicient of performance" COP values of heat pumps.
I state, that the temperature has to be higher than another variable z. But it can happen, that in order to fullfill x >= z, x would have to take a value outside the intervals.
What will Gurobi do? Is it always infeasible in this case or does it just assign x to the highest possible value of the interval?
https://www.gurobi.com/documentation/9.5/refman/objectives.html#subsubsection:PiecewiseObj Here it says that values outside the bound are extrapolated with the gradient between the last two pairs. After this I think, that Gurobi will just extrapolate the values, am I right?
Thanks for your answer in advance!
-
Official comment
This post is more than two years old. Some information may not be up to date. For current information, please check the Gurobi Documentation or Knowledge Base. If you need more help, please create a new post in the community forum, or try Gurobot, our chatbot interface offering instant, expert-level support. -
Hi Eva,
Yes, you are right. As described in the documentation,
The first pair and last pair of points each define a ray, so values outside the specified \(x\) values are extrapolated from these points.
Of course, the LB and UB defined on the variable \(x\) would be respected.
Best regards,
Maliheh